Abstract
Specifies rules for a certification scheme. Such a scheme for continuous production consists of the following stages: suitability testing, internal inspection by the manufacturer, inspection and supervision by an external body.
General information
-
Status: PublishedPublication date: 1992-11Stage: International Standard confirmed [90.93]
-
Edition: 1Number of pages: 5
-
Technical Committee :ISO/TC 17/SC 16
- RSS updates