Abstract
ISO 14692-4:2002 gives requirements and recommendations for the fabrication, installation and operation of GRP piping systems for use in oil and natural gas industry processing and utility service applications. The recommendations apply to delivery, inspection, handling, storage, installation, system pressure testing, maintenance, repair and decommissioning.
It is intended to be read in conjunction with ISO 14692-1, which includes an explanation of the pressure terminology used in ISO 1469-4:2002.
General information
-
Status: WithdrawnPublication date: 2002-12Stage: Withdrawal of International Standard [95.99]
-
Edition: 1Number of pages: 52
-
Technical Committee :ISO/TC 67/SC 6
- RSS updates
Life cycle
-
Now
-
00
Preliminary
-
10
Proposal
-
20
Preparatory
-
30
Committee
-
40
Enquiry
-
50
Approval
-
60
Publication
-
90
Review
-
95
Withdrawal
Corrigenda
Correct the current edition; free; not included in the text of the existing standard.WithdrawnISO 14692-4:2002/Cor 1:2006
-
00
-
Revised by
PublishedISO 14692-4:2017